NEC 220.87: Sizing a Panel Using Actual Demand Data
NEC 220.87 lets an electrician base the existing load on actual recorded demand, a year of utility data or a 30-day load study, instead of a conservative paper estimate. It can show real headroom for an EV charger or heat pump, if your inspector accepts it.
⚠️ Safety first: Work inside a panel or on a 240V circuit should be done by a licensed electrician, with a permit where your area requires one. This page explains the planning, not how to do the wiring.
The kW values are examples. Your electrician must use actual recorded demand from your utility or a load study, and the inspector decides what is accepted.
What NEC 220.87 allows
NEC 220.87 (Determining Existing Loads) lets the existing load on a service be based on actual maximum demand, instead of a paper calculation from nameplate values. A Dranetz application note summarises two ways to get the data:
- One year of maximum demand records. For homes, this usually comes from the utility's billing or interval data.
- A load study of at least 30 days with demand averaged over 15-minute periods, taken with a power logger while the home is occupied. It must include the heating and cooling equipment, using whichever is larger.
The formula
The check is that 125% of the existing maximum demand, plus the new load, does not overload the service. A worked example with illustrative numbers:
| Step | Value |
|---|---|
| Highest recorded demand | 9.2 kW |
| Convert to amps at 240V | 9,200 / 240 = 38.3A |
| Multiply by 125% | 47.9A |
| New 32A charger at 125% | 40A |
| Total | 87.9A, compared with the service rating |
If your utility data lists 15-minute energy (kWh) instead of demand (kW), multiply the highest 15-minute kWh value by 4 to convert it to kW.
Limits to keep in mind
- The home needs a real occupancy history. Data from an empty house does not show real demand.
- Utility data often does not capture a full heating or cooling peak if it was not running. A load study must account for the larger of the two.
- Acceptance depends on your local inspector. Some will not accept the method, or will want a licensed electrician or engineer to prepare it.
- Load management is an alternative if you do not have the data. See the load management guide.
For the broader rules behind these numbers, read our NEC 80% rule explained, which covers 220.82, 220.83 and 220.87.
Sources
Frequently Asked Questions
Q: What is NEC 220.87 used for?
A: It lets the existing load on a service be based on actual recorded maximum demand, instead of a calculated estimate, when you add a new load such as an EV charger or heat pump.
Q: How much data does NEC 220.87 need?
A: One year of maximum demand records, or a load study of at least 30 days averaged over 15-minute periods, taken while the home is occupied and including heating and cooling equipment.
Q: Will my inspector accept a 220.87 calculation?
A: That is a local decision. Ask before you spend money on data or a load study.