FPL 200A Panel Upgrade: Meter, Permit and Insurance
In Florida a panel upgrade usually runs through a county or city permit, with FPL involved when meter equipment is changed. Insurers also care about panel brand and age.
⚠️ Safety first: Work inside a panel or on a 240V circuit should be done by a licensed electrician, with a permit where your area requires one. This page explains the planning, not how to do the wiring.
Permit and meter
A licensed electrician replaces the panel under a local permit. FPL's Electric Service Standards cover meter equipment, with a long list of approved meter enclosures; its revision log notes that ring-style cans were removed in 2022 and that meter enclosures must be 3 feet from doors and windows. The readable portion of that document does not describe the release process, so ask your electrician and your county or city building department how meter release works locally. The log also notes that flood elevation is an inspecting-authority requirement, not an FPL requirement.
Insurance angle
Insurers in Florida may ask about panel age and brand. See our insurance and panel guide and Federal Pacific panels pages. Ask your insurer in writing what documentation it needs after an upgrade.
Costs
Costs vary widely by home, location and scope, and utility rules change, so this page does not quote a price. Get written quotes from licensed electricians, ask your utility for its current requirements, and see our national panel upgrade cost guide for typical ranges.
Sources
Frequently Asked Questions
Q: Who handles my permit in FPL territory?
A: Your electrician pulls the permit from the county or city building department. FPL is involved when meter equipment changes.
Q: Does a panel upgrade help with insurance?
A: It may help if your insurer flags the panel, but ask the insurer what it requires.
Q: Does FPL set flood requirements for meters?
A: FPL's revision log says flood elevation is an inspecting-authority requirement, not FPL. Ask your local building department.